Industries

Industrial twins built around the decision—not a generic 3D shell.

Each lane has its own assets, event logic, KPIs, constraints, calibration inputs and evidence output. The visual fidelity never substitutes for model confidence.

01 / MINING

Mining & resources

Haul-road grade and turns, loader-truck balance, crusher feed, ROM buffer, stockpiles, equipment uptime and wet-season access.

Mine plansFleet cyclesPhysics
02 / FACTORY

Manufacturing & process

Fabrication cells, assembly flow, first-pass yield, changeovers, quality capacity, material travel and automation options.

Line balanceDowntimeTakt
03 / WAREHOUSE

Warehousing & fulfilment

Receiving, replenishment, slotting, pick routes, packing, sortation, docks, carrier cut-offs and seasonal peaks.

WMS dataLabourLayout
04 / COLD CHAIN

Food, pharma & cold chain

Dock-to-cold time, QA, temperature exposure, cold-room turns, marshalling, reefer availability and value at risk.

TemperatureTraceabilityDispatch
05 / TERMINALS

Ports, terminals & yards

Gate queues, OCR and weighbridge service, arrival staging, yard occupancy, rehandles, dwell and dispatch waves.

Yard mapMovesDwell
06 / UTILITIES

Water, wastewater & energy

Hydraulic continuity, equalisation, treatment quality, storage, process headroom, energy demand, outages and maintenance.

SCADAQualityContinuity
07 / INFRASTRUCTURE

Construction & infrastructure

Site access, staging, crane and plant movement, programme sequencing, logistics interfaces and asset handover.

BIMProgrammeAccess
08 / PRIMARY

Agri-processing & packhouses

Harvest peaks, grading, packing, cooling, storage, dispatch, yield loss and labour availability.

SeasonalityYieldCold room
EXTENSIONS

Workshops, clinics & service flow

Useful for repeated, resource-constrained flow decisions, with stricter privacy and evidence boundaries where people data is involved.

QueuesResourcesPrivacy
Fit test

When is a digital twin worth it?

A twin is strongest when the real change is expensive, the flow repeats, performance is measurable and the model can influence a decision. It is weaker when the problem is a one-off judgement with no reliable operating data.

STRONG FIT

Material operating cost

Delay, downtime, lost throughput, spoilage, labour, demurrage or capex is large enough to measure.

STRONG FIT

Spatial or resource constraint

Routes, gates, buffers, assets, crews, storage or process stages interact and create queues.

STRONG FIT

Repeatable decision

The operation will face the decision again, or the model will be updated as evidence improves.

Bring your own layout and scenario.

We can begin from a floor plan, mine plan, BIM model, GIS layer, aerial, photo set or a rough operating sketch.